After having a new gas boiler installed, you should receive several important documents, including a completed commissioning record, operating instructions, warranty information and an invoice. In England and Wales, you should also receive a Building Regulations Compliance Certificate once the installation has been properly notified.

Not all boiler installation documents are certificates, and they won’t necessarily arrive together. Some should be provided when the engineer finishes the installation, while others may arrive later by post or email.

Knowing what to expect can help you confirm that the installation has been documented correctly, protect your warranty and avoid problems when selling your home.

Boiler installation paperwork checklist

The following table covers the main documents you should receive after a typical domestic gas boiler installation.

DocumentWho provides it?When should you receive it?
Building Regulations Compliance CertificateCompetent person scheme or relevant building-control bodyAfter notification and processing
Benchmark commissioning recordInstallerAt installation handover
Boiler operating instructionsInstaller or manufacturerAt installation handover
Manufacturer warranty confirmationManufacturer, sometimes arranged by installerFollowing registration
Installation invoiceInstallation companyAccording to agreed payment terms
Workmanship guaranteeInstaller, if offeredUsually at handover
Landlord Gas Safety RecordGas Safe registered engineer, where requiredFollowing the relevant safety check

The exact documents depend on the type of work and which part of the UK you live in.

For most homeowners, the Building Regulations certificate and commissioning record are the two most important documents to understand, because they serve different purposes.

1. Building Regulations Compliance Certificate

A Building Regulations Compliance Certificate provides evidence that qualifying installation work has been notified and certified through the appropriate procedure.

In England and Wales, replacement gas boiler installations are generally notifiable under Building Regulations.

A registered installer can normally arrange notification through an authorised competent person scheme, rather than requiring you to apply to Building Control yourself.

If your installation follows a different approval route, the paperwork may instead come from the relevant building-control body.

The certificate normally identifies the property, the work carried out and the relevant notification details.

It’s worth keeping because it may be requested when you sell your home or need to demonstrate that the installation was properly documented.

For a more detailed explanation of boiler installation regulations, the requirements also cover matters such as energy efficiency, flue arrangements and safe installation.

How long does a boiler compliance certificate take to arrive?

The certificate doesn’t normally need to be handed over on installation day.

GOV.UK states that an installer registered with a competent person scheme should provide the relevant certificate within eight weeks of completing the work.

Many certificates arrive sooner, but eight weeks is the published timeframe for that route in England.

If you haven’t received anything after several weeks, contact your installer to confirm that the notification has been submitted.

The exact arrangements may differ elsewhere in the UK.

2. Benchmark commissioning checklist

The Benchmark commissioning record is completed when the heating engineer installs and sets up your boiler.

Commissioning involves checking that the appliance and heating system are operating safely and correctly according to the manufacturer’s instructions.

The record normally includes information such as:

  • Boiler make, model and serial number.
  • Installation address and commissioning date.
  • Engineer and company details.
  • Gas safety and combustion test results.
  • Heating controls and operating settings.
  • System treatment and other installation checks.
  • Confirmation that the homeowner has been shown how to operate the boiler.

The commissioning record provides useful evidence of the checks carried out during installation.

This document isn’t the same as the Building Regulations Compliance Certificate. The two documents serve different purposes, and you should retain both where applicable.

Are Benchmark records now digital?

Yes. In October 2026, the Heating and Hotwater Industry Council announced that the Benchmark commissioning and servicing record had moved to a digital system.

The paper-based checklist is no longer maintained, with the latest version available through Benchmark’s online platform and app.

Your installer can therefore complete the record digitally rather than filling out a paper checklist.

Make sure you can access or download a copy for your own records.

You should also receive an explanation of the boiler’s controls and basic operation before the engineer leaves.

3. Manufacturer warranty confirmation

Most new boilers come with a manufacturer’s warranty, although the length and conditions vary between brands and models.

The warranty may cover certain parts and repairs if the boiler develops a qualifying fault during the specified period.

However, buying and installing a new boiler doesn’t necessarily mean its warranty has been registered automatically.

The installer may register it on your behalf, but you should check that the process has been completed.

Your warranty confirmation may include:

  • Boiler model and serial number.
  • Installation date.
  • Warranty registration number.
  • Duration of cover.
  • Terms and conditions.
  • Servicing requirements.

Some manufacturers require registration within a specific period after installation. The Benchmark scheme’s published guidance highlights registration within one month, but you should follow the deadline stated by your boiler manufacturer.

If the installer says they’ve registered the boiler, ask for confirmation.

Does the warranty depend on annual servicing?

Manufacturer warranties commonly require the boiler to be serviced in accordance with the manufacturer’s instructions, often annually.

Failing to meet the servicing conditions can affect warranty cover.

Keep evidence of each service, including invoices and completed service records.

If you’re unsure what maintenance involves, a typical annual boiler service includes checks of the appliance’s safety, condition and operation.

4. Boiler user manual and operating instructions

Your installer should provide the instructions needed to operate and look after your new boiler safely.

These may be supplied as printed documents or electronic manuals.

They should explain how to use the controls, adjust settings and recognise common fault messages.

If a new thermostat or programmer has been fitted, you should also receive the relevant instructions.

Before the engineer leaves, it’s worth asking them to demonstrate how to:

  • Adjust the heating temperature.
  • Use the thermostat and heating schedule.
  • Read the boiler pressure display.
  • Identify common fault codes.
  • Turn the appliance off when necessary.

You shouldn’t need to understand technical gas components or carry out work inside the boiler.

The aim is simply to make sure you can operate the heating system safely and recognise when professional help is needed.

5. Installation invoice and workmanship guarantee

An installation invoice isn’t a safety certificate, but it’s an important document to keep.

It confirms who carried out the installation, when the work took place and what you paid for.

A detailed invoice may also identify the boiler model and any additional equipment installed.

This can be useful when contacting the installer, manufacturer or warranty provider.

Some installation companies also provide a separate workmanship guarantee.

This covers aspects of the installation work under the installer’s own terms, rather than defects covered by the boiler manufacturer’s warranty.

For example, an installer might guarantee certain pipework or installation work for a specified period.

Not every installation comes with the same guarantee, so check what’s included and how long it lasts.

6. Do you need a Gas Safety Certificate after a new boiler installation?

This is a common source of confusion.

People sometimes use the term Gas Safety Certificate to describe any paperwork associated with a gas boiler.

However, a Landlord Gas Safety Record, often called a CP12, is different from a Building Regulations Compliance Certificate.

A landlord gas safety record documents a gas safety check carried out on the relevant appliances and flues in a rented property.

In Great Britain, landlords have legal responsibilities to arrange appropriate checks and provide records to tenants.

Existing tenants must normally receive the latest record within 28 days of the check, while new tenants must receive it before moving in.

A homeowner living in their own property doesn’t generally need an annual Landlord Gas Safety Record simply because they’ve had a new boiler installed.

Landlords should also remember that commissioning a new boiler and meeting ongoing gas safety check obligations are separate responsibilities.

7. What if your boiler installation certificate hasn’t arrived?

If you’re missing paperwork, the first step is to establish exactly which document you need.

A missing commissioning record is different from a Building Regulations certificate that was never issued.

Contact the original installer

Ask whether the installation was properly notified and whether a certificate has been issued.

If the certificate exists, the installer may be able to provide the notification details or help you obtain a replacement.

For a missing Benchmark record, ask the engineer for a copy of the completed commissioning information.

Check with the relevant scheme or Building Control

If the installer doesn’t respond, contact the competent person scheme or relevant building-control service.

They may be able to establish whether the installation was registered and explain how to request the necessary documentation.

You may need the property address, installation date and installer details.

Contact the manufacturer about missing warranty information

If you haven’t received warranty confirmation, contact the manufacturer with the boiler’s model and serial number.

Ask whether the product has been registered and what evidence of commissioning or servicing is required.

Don’t assume that an invoice alone establishes the full warranty period.

What if the installation was never notified?

If the work should have been notified but wasn’t, the situation is more complicated than replacing a lost certificate.

In England, local authority Building Control may be able to advise about retrospective regularisation, depending on the circumstances.

That process can involve inspections, additional work and fees.

You shouldn’t assume another engineer can simply issue the missing certificate without following the applicable procedure.

8. Do boiler certificate requirements differ across the UK?

Yes. England, Wales, Scotland and Northern Ireland have different building-control arrangements.

NationMain paperwork consideration
EnglandQualifying work is normally notified through a competent person scheme or the relevant building-control route
WalesHeating-system work must follow Welsh Building Regulations and the applicable certification or approval arrangements
ScotlandSeparate building standards apply; a building warrant and accepted completion certificate are required where the work falls within the warrant system
Northern IrelandReplacement-boiler work may involve local council Building Control notification, inspection and a completion certificate

In Scotland, not every straightforward boiler replacement requires a building warrant, so homeowners shouldn’t assume they’ll receive the same certificate used in England.

In Northern Ireland, Building Control guidance for replacement boilers explains the notification and inspection process and the issuing of a completion certificate when the work complies.

The safest approach is to ask your installer which notification procedure applies to your property and what documents you should expect.

9. Keep your boiler documents together

After installation, it’s worth keeping a single folder containing your boiler paperwork.

This could be a physical folder or a digital collection of scanned documents and emails.

Include your compliance certificate, commissioning record, warranty confirmation, operating instructions, invoice and subsequent service records.

These documents may be useful when arranging repairs, demonstrating warranty compliance or selling your property.

Keeping them together also makes it easier to identify missing information while the installation is still recent.

Frequently asked questions

Is a boiler installation certificate compulsory?

For qualifying notifiable boiler installations, the appropriate Building Regulations procedure must be followed. The certificate or completion documentation depends on the UK nation and approval route. Commissioning records are also an important part of the installation process.

How long does it take to receive a boiler installation certificate?

In England, GOV.UK states that a registered competent person scheme installer should provide the certificate within eight weeks of completion. Other documentation, such as the commissioning record, should be available at installation handover.

Is a Gas Safe ID card the same as a boiler installation certificate?

No. A Gas Safe ID card identifies the engineer and the categories of gas work they’re registered to carry out. It isn’t evidence that a particular boiler installation has been notified to Building Control.

Can I get a replacement boiler installation certificate?

Usually, if the original certificate was properly issued. Contact the installer, relevant competent person scheme or building-control body to find out how to obtain a replacement.

Do I need boiler installation paperwork when selling my house?

Buyers or their solicitors may ask for evidence that the boiler installation complied with Building Regulations, along with relevant warranty and servicing information. Having the documents available can help avoid delays during the sale.

Is a Benchmark commissioning record proof of Building Regulations notification?

No. It records the commissioning work carried out on the boiler. It doesn’t replace the separate Building Regulations notification or compliance certificate where one is required.

Sources

GOV.UK, Use a Competent Person Scheme (https://www.gov.uk/building-regulations-approval/use-a-competent-person-scheme)

GOV.UK, Building Regulations Approval: How to Apply (https://www.gov.uk/building-regulations-approval/how-to-apply)

Welsh Government, Building Regulations: Boilers and Heating (https://www.gov.wales/building-regulations-boilers-and-heating)

Scottish Government, Building Standards Procedural Handbook — Completion (https://www.gov.scot/publications/building-standards-procedural-handbook-third-edition-version-1-9/pages/5/)

Building Control Northern Ireland, Replacement Boilers (https://www.buildingcontrol-ni.com/assets/pdf/Replacement-Boilers-2.pdf)

Benchmark, Do I Need Benchmark? (https://www.benchmark.org.uk/about/do-i-need-benchmark)

Accurate as of: 6 November 2026